Our company experienced while complied it’s first contract for Aytemiz Petroleum Mersin Marine Terminal during 2003.The lenght of pipeline passing underwater which was 4300 mtr.
today's one of the biggest problem is releated to metropolitan regions with the dirinking water supply.In this section our company is honered with following 3 big projects;
1. We were complied engineering and the manufacturing jobs for connection of Sapanca Lake to the Yuvacık Dam at İzmit in Turkey (Ø 1300 mm)
2. Great Melen waterpipeline connection
3. Kızılırmak / ASKI(Ø 1620 mm) drinking water supply connection to Ankara city drinking water supply network.
4. DSI MELEN FITTING
Liquid fuel storage and filling facilities (turn key) LPG storage and filling facilities
|